2 – Drill holes with a minimum diameter of 168 mm and 150 mm deep.
3 – Cut a groove at least 25 mm wide and 70 mm deep between the holes.
4 – Clean and dry the holes and groove in order to remove all traces of dust and moisture that would affect the adhesive’s performance (follow the manufacturer’s instructions).
5 – Pour suitable adhesive into the holes and insert the pre-wired studs. Use a mallet to make sure they are flush with the ground surface. Make sure the LEDs are facing the right way and are parallel to the ground. Immediately clean any residual adhesive with a clean, dry rag. We recommend using Sikadur 30 two-component epoxy resin.
6 – Leave a weight on the stud until the adhesive has set (see the manufacturer’s instructions for the necessary time).
IMPORTANT: Do not bend the cable where it leaves the stuffing box. Protect cables in a sheath. The guarantee may not apply if these instructions are not followed.